Projects

Home    |     Projects

demar instaladora y constructora

1

Interconnection and testing of submarine cable of the platform PP-ZAAP-Z to peripheral MALOOB ZAAP.

2

Flexibility to gas line, Pumping tire (B.N) 8" diameter.

3

Analysis of flexibility for process piping, platform PP MALOOB -A.

4

Engineering for trading platforms for access to valves and design supporting lines By-Pass, platforms PP-ZAAP-D, PP-ZAAP-B and PP-MALOOB-D.

5

Engineering for platform operations of valves of 8 ", 12" and 16 "in diameter at the PB-KU-A2 platform.

6

Transportation analysis and lifting of turbopumps and crane pedestal, REBOMBEO platform.

7

Engineering for false labor for equipment installation, REBOMBEO platform.

8

Analysis of screens for radiation burner four piles, REBOMBEO platform.

9

Transportation and Lifting Analysis (onshore and offshore) of equipment process, REBOMBEO platform.

10

Project report for driven pile and sheet piles quay into Terminal Marítima de Dos Bocas (TMDB) to project shield.

PROJECTS ACOMPLISHED / BPZ EXPLORACIÓN Y PRODUCCIÓN

1

Study of damage, CX-11 CORVINA platform.

2

Assessment analysis, CORVINA CX-11 platform.

3

Reinforcement engineering, CORVINA CX-11 platform.

4

Dynamic vibration analysis and fatigue analysis due to the compressor installation, CORVINA CX-11 platform.

5

Reinforcement engineering for compressor installation, CORVINA CX-11 platform.

6

Vessel impact analysis in a leg jacket, CORVINA CX-11 platform.

7

Assessment analysis, ALBACORA platform.

8

Reinforcement engineering of the lower topside, ALBACORA platform.

COMMSA

1

Transportation and loadout analysis of the Bridge corresponding at the E-KU-A2 platform.

2

Transportation and loadout analysis of the topside, SINAN-C platform.

3

Design mono buoy Sihil-A.

4

Installation analysis of the structure attached SINAN-D.

5

Installation analysis of the reinforced four piles TUMUT-A.

6

Installation analysis of four piles AKAL-TN.

7

Installation analysis, AKAL-TTM and AKAL-TKL platforms.

8

Installation analysis, ATUN-D platform.

9

Installation analysis, KAMBESAH platform.

GEOMSA

1

Transportation analysis of piles and jacket, YAXCHE-A platform.

2

Transportation and loadout analysis of the topside, SINAN-D platform.

3

Transportation and loadout analysis of the topside, SINAN-C platform.

4

Transportation and loadout analysis of the topside and jacket, SINAN-B platform.

5

Transportation, ultimate strength and earthquake analysis of the attached structure, Sinan-D platform.

6

Transportation and loadout analysis of the topside and jacket, SINAN-A platform.

7

Installation analysis, of an intermediate three piles burner PB-KU-A2. YAXCHÉ – A.

8

Transportation analysis of the topside, SINAN-A platform.

9

Transportation, ultimate strength and earthquake analysis, MAY-D-NE and SINAN-NE platforms.

ICA – FLUOR / IH

1

Technical assistance in-site (Office Ica-Fluor).

2

Installation analysis, YAXCHE-A platform.

3

Transportation analysis, MAY-D platform.

4

Installation analysis, YAXCHE-B platform.

5

Installation analysis, KAB-A platform.

6

Installation analysis, AKAL-TI and AKAL-TR platforms.

7

Structural Review to the CAYO ARCAS housing platform.

OCEANOGRAFía

1

Erection analysis of the jacket, KAMBESAH platform.

2

Wet transportation Analysis of jacket, KAMBESAH platform.

3

Transportation analysis and safe abandonment of the jacket structure, KUIL-A platform.

4

Installation analysis, TSIMIN-A platform.

5

Installation analysis, TSIMIN-B platform.

6

Installation analysis of two bridges and a three piles, E-KU-A2 platform.

7

Analysis of driving of the oil conductors, MALOOB-D platform.

8

Link plates review for lifting, jackets TSIMIN-A and TSIMIN-B.

GLOBAL OFFSHORE MEXICO

1

As-Built Engineering of submarine lines L-56 and L-57.

2

As-Built engineering project: procurement and construction of an oil-gas pipeline 24 "diameter x 3.3 km length from PP-MALOOB-D to PP-MALOOB A platform and BN** pipeline 8" diameter x 2.6 km PP-MALOOB-B to PP-MALOOB-D platform, in the KU-MALOOB-ZAAP field, Sonda de Campeche, Gulf of Mexico.

3

As-Built engineering procurement and construction of two marine pipelines: an oil-gas pipeline 16 "of diameter x 9.2 km from CHUHUK-A to HOMOL-A platform and an oil-gas pipeline 16" of diameter x 8.6 km from ETKAL-101 platform to submarine shooting CHE-1.

4

Engineering As-Built for pipeline 24" of diameter x 17 Km length about handling sour gas from IXTOC-A to AKAL-F platform.

GLOBAL OFFSHORE MÉXICO

1

Ingeniería As-Built para gasoducto de 24" de diámetro x 17 Km aproximadamente de longitud para manejo de gas amargo desde la plataforma IXTOC-A hacia la plataforma AKAL-F.​

2

Ingeniería As-Built del proyecto: procura y construcción de un oleogasoducto de 24" diámetro x 3.3 km aproximadamente de longitud de la plataforma PP- MALOOB-D hacia plataforma PP- MALOOB-A y gasoducto de BN de 8" diámetro x 2.6 km aproximadamente de la plataforma PP- MALOOB-B hacia PP-MALOOB-D, en el campo KU-MALOOB-ZAAP, Sonda de Campeche , Golfo de México.

3

Ingeniería As-Built para procura y construcción de 2 ductos marinos: un oleogasoducto de 16" de diámetro x 9.2 km de la plataforma CHUHUK-A hacia la plataforma HOMOL-A y un oleogasoducto de 16" de diametro x 8,6 km de la plataforma ETKAL-101 hacia disparo submarino en CHE-1.

4

Ingeniería As-Built de líneas submarinas L-56 y L-57.

IDEAS

1

Design and analysis of working deck, YAXCHE-A platform.

2

Design and analysis of working deck, MAY-D platform.

3

Design and analysis of working deck, KAB-B platform.

4

Design and analysis to installation and interconnection of three lifeboats for ABK-N1 operational center and centers of ABK-A and POL-A process.

5

Basic and detailed engineering installation eleven lifeboats in central APAPCH process and a boat in the cases of Terminal Marítima Dos Bocas (TMDB) Engineering.

6

Adequacy of areas on Satellite POL-TF platform for entry of equipment drilling.

PERMADUCTO

1

ONEL-A, safe abandonment analysis for the project: "Transport and Installation of CHUHUK-A, EKTAL-101, AKAL-O, ONEL-A, XUX-A and XUX-B platforms, as well as assembly and interconnection structures and equipment auxiliary marine regions of Pemex Exploración y Producción (PEP).

2

XUX-B, safe abandonment for the project: "Transport and Installation of CHUHUK-A, EKTAL-101, AKAL-O, ONEL-A, XUX-A and XUX-B platforms, as well as assembly and interconnection structures and equipment auxiliary marine regions of Pemex Exploración y Producción (PEP).

3

EKTAL-101 safe abandonment for the project: "Transport and Installation of CHUHUK-A, EKTAL-101, AKAL-O, ONEL-A, XUX-A and XUX-B platforms, as well as assembly and interconnection structures and equipment auxiliary marine regions of Pemex Exploración y Producción (PEP).

VIGEN

1

Assessment analysis, EK-TB platform.

2

Design and analysis of the four piles, KAMBESAH platform.

IF YOU HAVE A PROJECT THAT YOU WOULD LIKE TO QUOTE FOR

If you have a project in which you need support, fill out a form and request a service quote, we are ready to support you and be part of the success of your structural development.

Contact us (999) 315-6899 or Request a quote here

Diplamar

Innovative company that uses cutting-edge technology, supported by continuous updating and improvement. We are the best distributors of specialized software and we support our clients in carrying out their projects.

About Us
Certifications
Contact
Location

Design of structures
Analysis and Evaluation
Analysis and Installation
Training and Coaching

AFT
Bentley
Ultramarine Europe
Downloads

We share with you several of the projects that we have successfully carried out.