Español      English

Diplamar - Home 01 Accio
accio

diplamar

engineering services

accio

The Best

Choice

accio

high quality

services

accio

10 Years

of experience

 
 

About us

nosotros 2

Purpose

 

Our main goal is to fulfill the customer`s requirement at every moment, we are consultants and we know that customers need to be supported, so that we are ready to help them any time.

 

Mission

 

To develop Engineering projects with high quality and innovation by working with excellent human resources.

 

Vision

 

Diplamar will use top technology by supporting the updating and continuous improvement, allowing a better innovation and giving benefits to our customers being the best option and investment for them.

 

About us

 

Founded in 2005, DIPLAMAR is a proudly Mexican company that was created to support, both construction and engineering offshore platform in the oil industry in general. Our main goal is to provide an immediately and precise answer. This means guarantee to our customers to the engineering services we have given to them.

 

CERTIFICATION

  • DIPLAMAR has obtained the certification in accordance with ISO 9001:2008 with the scope: Design, Analysis, Assessment and Generation of Engineering Calculation reports for Construction of Onshore and Offshore Facilities
  • DIPLAMAR`s service offers to our customers each time more benefits and the most important is that the customer is completely satisfied with our service.
  • Our quality control is rigorous, there is no doubt about our quality services given to our customers. Our certification is not just a piece of paper, we live and apply it in our daily tasks.
 
 

CHANNEL PARTNER AFT

Bentley
  • We are sales representative of AFT in Mexico.
    Software to Analyze Flow in Pipes and Systems Modeling.
  • We offer consulting, training and sales programs:
    Fathom, Arrow, Impulse, Mercury, Titan, SteamCalc, Chempak Engineering Utility Suite and Suite.
Channel Partner AFT / Diplamar
 
 

CHANNEL PARTNER BENTLEY

Bentley
  • We are sales representative of Bentley in:
    Mexico, Ecuador, Perú, Chile Argentina and Colombia.
  • We offer consulting, training and sales programs:
    Sacs, ProjectWise, Moses, Microtation, Autopipe, Pro Structures, Ram and Staad.
evento bentley
 

PARTNERS OF PRONAL, IHC AND CORE

  •  We are representatives of Pronal, IHC and CORE in México.

Logo Pronal                   Logo Royal                 Logo Core

 
Download the complete presentation services
 
  • PROJECTS ACOMPLISHED

    DEMAR INSTALADORA Y CONSTRUCTORA.
    * Interconnection and testing of submarine cable of the platform PP-ZAAP-Z to peripheral MALOOB ZAAP.
    * Flexibility to gas line, Pumping tire (B.N) 8" diameter.
    * Analysis of flexibility for process piping, platform PP MALOOB -A.
    * Engineering for trading platforms for access to valves and design supporting lines By-Pass, platforms PP-ZAAP-D, PP-ZAAP-B and PP-MALOOB-D.
    * Engineering for platform operations of valves of 8 ", 12" and 16 "in diameter at the PB-KU-A2 platform.
    * Transportation analysis and lifting of turbopumps and crane pedestal, REBOMBEO platform.
    * Engineering for false labor for equipment installation, REBOMBEO platform.
    * Analysis of screens for radiation burner four piles, REBOMBEO platform.
    * Transportation and Lifting Analysis (onshore and offshore) of equipment process, REBOMBEO platform.
    * Project report for driven pile and sheet piles quay into Terminal Marítima de Dos Bocas (TMDB) to project shield.
  • PROJECTS ACOMPLISHED

    BPZ EXPLORACIÓN Y PRODUCCIÓN.
    * Study of damage, CX-11 CORVINA platform.
    * Assessment analysis, CORVINA CX-11 platform.
    * Reinforcement engineering, CORVINA CX-11 platform.
    * Dynamic vibration analysis and fatigue analysis due to the compressor installation, CORVINA CX-11 platform.
    * Reinforcement engineering for compressor installation, CORVINA CX-11 platform.
    * Vessel impact analysis in a leg jacket, CORVINA CX-11 platform.
    * Assessment analysis, ALBACORA platform.
    * Reinforcement engineering of the lower topside, ALBACORA platform.
  • PROJECTS ACOMPLISHED

    COMMSA.
    * Transportation and loadout analysis of the Bridge corresponding at the E-KU-A2 platform.
    * Transportation and loadout analysis of the topside, SINAN-C platform.
    * Design mono buoy Sihil-A.
    * Installation analysis of the structure attached SINAN-D.
    * Installation analysis of the reinforced four piles TUMUT-A.
    * Installation analysis of four piles AKAL-TN.
    * Installation analysis, AKAL-TTM and AKAL-TKL platforms.
    * Installation analysis, ATUN-D platform.
    * Installation analysis, KAMBESAH platform.
  • PROJECTS ACOMPLISHED

    GEOMSA.
    * Transportation analysis of piles and jacket, YAXCHE-A platform.
    * Transportation and loadout analysis of the topside, SINAN-D platform.
    * Transportation and loadout analysis of the topside, SINAN-C platform.
    * Transportation and loadout analysis of the topside and jacket, SINAN-B platform.
    * Transportation, ultimate strength and earthquake analysis of the attached structure, Sinan-D platform.
    * Transportation and loadout analysis of the topside and jacket, SINAN-A platform.
    * Installation analysis, of an intermediate three piles burner PB-KU-A2.
    * YAXCHÉ – A.
    * Transportation analysis of the topside, SINAN-A platform.
    * Transportation, ultimate strength and earthquake analysis, MAY-D-NE and SINAN-NE platforms.
  • PROJECTS ACOMPLISHED

    ICA – FLUOR / IH.
    * Technical assistance in-site (Office Ica-Fluor).
    * Installation analysis, YAXCHE-A platform.
    * Transportation analysis, MAY-D platform.
    * Installation analysis, YAXCHE-B platform.
    * Installation analysis, KAB-A platform.
    * Installation analysis, AKAL-TI and AKAL-TR platforms.
    * Structural Review to the CAYO ARCAS housing platform.
     
     
     
  • PROJECTS ACOMPLISHED

    OCEANOGRAFIA.
    * Erection analysis of the jacket, KAMBESAH platform.
    * Wet transportation Analysis of jacket, KAMBESAH platform.
    * Transportation analysis and safe abandonment of the jacket structure, KUIL-A platform.
    * Installation analysis, TSIMIN-A platform.
    * Installation analysis, TSIMIN-B platform.
    * Installation analysis of two bridges and a three piles, E-KU-A2 platform.
    * Analysis of driving of the oil conductors, MALOOB-D platform.
    * Link plates review for lifting, jackets TSIMIN-A and TSIMIN-B.
  • PROJECTS ACOMPLISHED

    GLOBAL OFFSHORE MEXICO .
    * As-Built Engineering of submarine lines L-56 and L-57.
    * As-Built engineering project: procurement and construction of an oil-gas pipeline 24 "diameter x 3.3 km length from PP-MALOOB-D to PP-MALOOB A platform and BN** pipeline 8" diameter x 2.6 km PP-MALOOB-B to PP-MALOOB-D platform, in the KU-MALOOB-ZAAP field, Sonda de Campeche, Gulf of Mexico.
     
    * As-Built engineering procurement and construction of two marine pipelines: an oil-gas pipeline 16 "of diameter x 9.2 km from CHUHUK-A to HOMOL-A platform and an oil-gas pipeline 16" of diameter x 8.6 km from ETKAL-101 platform to submarine shooting CHE-1.
     
    * Engineering As-Built for pipeline 24" of diameter x 17 Km length about handling sour gas from IXTOC-A to AKAL-F platform.
     
  • PROJECTS ACOMPLISHED

    IDEAS.
    * Design and analysis of working deck, YAXCHE-A platform.
    * Design and analysis of working deck, MAY-D platform.
    * Design and analysis of working deck, KAB-B platform.
    * Design and analysis to installation and interconnection of three lifeboats for ABK-N1 operational center and centers of ABK-A and POL-A process.
    * Basic and detailed engineering installation eleven lifeboats in central APAPCH process and a boat in the cases of Terminal Marítima Dos Bocas (TMDB) Engineering.
    * Adequacy of areas on Satellite POL-TF platform for entry of equipment drilling.
     
     
     
     
  • PROJECTS ACOMPLISHED

    PERMADUCTO.
    * ONEL-A, safe abandonment analysis for the project: "Transport and Installation of CHUHUK-A, EKTAL-101, AKAL-O, ONEL-A, XUX-A and XUX-B platforms, as well as assembly and interconnection structures and equipment auxiliary marine regions of Pemex Exploración y Producción (PEP).
     
    * XUX-B, safe abandonment for the project: "Transport and Installation of CHUHUK-A, EKTAL-101, AKAL-O, ONEL-A, XUX-A and XUX-B platforms, as well as assembly and interconnection structures and equipment auxiliary marine regions of Pemex Exploración y Producción (PEP).
     
    * EKTAL-101 safe abandonment for the project: "Transport and Installation of CHUHUK-A, EKTAL-101, AKAL-O, ONEL-A, XUX-A and XUX-B platforms, as well as assembly and interconnection structures and equipment auxiliary marine regions of Pemex Exploración y Producción (PEP).
     
     
  • PROJECTS ACOMPLISHED

    VIGEN.
    * Assessment analysis, EK-TB platform.
     
    * Design and analysis of the four piles, KAMBESAH platform.
     
     
     
     
     
     
     
CUSTOMERS
 

Contact Us